Segment Erector

Product Details
Customization: Available
After-sales Service: 1 Year
Operation Form: Ground Operation
Manufacturer/Factory
Diamond Member Since 2023

Suppliers with verified business licenses

Registered Capital
30000000 RMB
Plant Area
>2000 square meters
  • Segment Erector
  • Segment Erector
  • Segment Erector
  • Segment Erector
  • Segment Erector
  • Segment Erector
Find Similar Products

Basic Info.

Model NO.
SEGMENT ERECTOR
Warranty
1 Year
Certification
GS, RoHS, CE, ISO9001
Precast Beam Carrier
Precast Beam Carrier
Beam Launcher
Beam Launcher
Rubber-Tired Beam Carrier
Rubber-Tired Beam Carrier
Wheel Rubber-Tired Beam Carrier
Wheel Rubber-Tired Beam Carrier
Straddle Carrier
Straddle Carrier
Beam Transport Trolley
Beam Transport Trolley
Beam Erector
Beam Erector
Launching Gantry (Balance Cantilever Typ
Launching Gantry (Balance Cantilever Type)
Transport Package
Naked
Specification
26*31.5*50 m
Trademark
SAINTWAH
Origin
Beijing
HS Code
842619300
Production Capacity
10000

Product Description

SEGMENT ERECTOR
 
 

SEGMENT ERECTOR

 

1. Capacity:30T-200T
2. Lifting path: 10m, 20m, 30m, 40m
3. Lifting speed: 0-3.0 m/min(No load),0-1.5 m/min(Load)
4. Crane Traveling speed: 0-6.0 m/min(No load), 0-3.0 m/min(Load)
5. SE Launching speed: 5m/min
6. Allowable slope: ≤5%(L),≤2%(T)
7. Crane side shifting speed: 0.5m/min
8. Power: 40-150Kw
9. Working class: A3/M4


HCR'S SE120 IN MARC BASNIGHT BRIDGE PROJECT, USA

  EQUIPMENT PROFILE  

Balance Cantilever Construction with Precast Segmental Bridge using Launching Gantry is an economical solution when it comes to high pier combined with difficult terrain. Therefore bridges crossing deep valley or the approach bridge for a Main Bridge with high Navigation Clearance are the best fit for this type of construction method.In urban development mobile crane can be used to erect the segments. But still a LG will provide better solution as the overhead construction interferes less with the traffic underneath.

  CANTILEVER STABILITY  

Segment can be delivered from rear, on the top of completed bridge or from below (above water or land).Delivery from the rear provides a better solution when it comes to high pier and difficult terrain. Box segment a very good access immediately upon completion of installation for the transportation.

 

  SEGMENT DELIVERY  

Main Truss can be utilized to stabilize the Balance Cantilever Bridge during construction. This prevents the usage of massive temporary support therefore enhance safety and speed. The design of the Main Truss that is used for stabilizing the Balance Cantilever Bridge has to take accident load into account and inmost of the cases this does not burden the original design.

 

   PARAMETERS  

No. Item Detail
1 Capacity(crane) 40T-150T
2 Capacity(full span) ≤2400T
3

Span

≤45m
4

Lifting speed

0-2.7m/min(No load)

0-1.5m/min(Load)

5

Crane traveling speed

0-10m/min (Load)
6

Launching speed

0-2.5m/min
7

Allowable slope

≤3%(L),≤3%(T)
8

Curve radius

≥800m
9

Power

130Kw
10

Working class

A3/M4

  PROJECT CASES  

Segment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment Erector

Segment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment ErectorSegment Erector

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier