Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year or 2000hours |
Suppliers with verified business licenses
Product introduction
It integrates mud drilling, air drilling and foam drilling, and is equipped with complete air drilling equipment and other geothermal well testing equipment to meet the requirements of multi-mode geothermal well drilling process;
It can realize the step-by-step guide rail sliding cluster well, and the mast hydraulic cylinder can be moved quickly;
The mast and substructure can rise by multi-stage hydraulic cylinder, which can be operated remotely;
Equipped with automatic pipe handling system (PRS), power elevators, iron roughneck and other automation equipment to reduce work intensity.
Equipped with ahigh-voltage room, so the drilling rig can obtain electricity from the industrial grid.
Technical parameter
1500HP |
Product parameters |
Rig model |
ZJ50/3500D |
Voltage/ Frequency |
600V/380V/50Hz |
Ambient temperature |
0ºC~+50ºC |
Drilling depth |
4-1/2" DP 3500~5000m 5" DP 2800~4500m |
Max. Static Hook Load |
3500kN |
Crown Sheave #& Travelling Sheave # |
6×7 |
Numbers of effective travelling lines |
12 |
Wireline Diameter |
φ35mm(1-3/8") |
Opening Diameter of Rotary Table |
952.5mm(37.5") |
Max. DW Input Power |
1500hp |
Max. DW Fastline pull |
425kN |
Power of Single Mud Pump X Qty. |
1600hp×3 |
Mast type and Clear height of Mast |
"K" 45m |
Mast Max. Static Hook Load |
3500kN |
Substructure type and Substructure Height |
Slingshot 9.68m(Include steel mat and guide rail) |
Rotary beam Max. static load |
3500kN |
Air control system Max. working pressure |
1MPa |
Standpipe pressure |
35MPa |
Total Volume of Mud Tank |
422m³ |
Electric Drive |
AC-SCR-DC |
Power system |
Main generator set and Qty.:(CAT3512B+SR4B)×4 Auxiliary generator set and Qty.:(C 15)×1 |