Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
echnical parameters of top hammer drill rig | ||||
Main parameters | SWDH89S | SWDH102S | SWDH115F | |
Working parameters | ||||
Hole Range | mm | 64-115 | 76-127 | 76-127 |
Drill Rod Model | T38,T45,T51 | T45,T51 | T38,T45,T51 | |
Drill Rod Length | mm | 3660 | 3660 | 3050 |
Economic Drilling Depth | m | 24 | 24 | 21 |
Hydraulic Rock Drifter | ||||
Impact power | kW | 14 | 18 | 20 |
Rotation torque | Nm | 700 | 1000 | 1300 |
Rotation Speed | Nm | 0-180 | 0-150 | 0-175 |
Diesel Engine | ||||
Model | CAT C7.1 | CAT C7.1 | QSB4.5 | |
Power | kW/rpm | 168/2200 | 168/2200 | 97/2200 |
Fuel tank | L | 450 | 450 | 300 |
Air Compressor | ||||
Pressure | bar | 8 | 10 | / |
F.A.D | m3/min | 8 | 10 | / |
Drill Arm | ||||
Type | Folding arm | Folding arm | Single straight arm | |
Lifting angle | o | +70~-10 | +70~-10 | -30~+45 |
Folding angle | o | 65~165 | 65~165 | / |
Swing angle | o | +20~-30 | +20~-30 | +30~-30 |
Advance Part | ||||
Advance length | mm | 7300 | 7300 | 6700 |
Compensation stroke | mm | 1200 | 1200 | 1200 |
Forward angle | o | 140 | 140 | 140 |
Flip angle | o | -20~90 | -20~90 | -20~90 |
Max. advance rate | m/s | 0.8 | 0.8 | 0.8 |
Max. Propulsion | kN | 25 | 25 | 25 |
Walking Ability | ||||
Max.Walking Speed | km/h | 4.2 | 4.2 | 4.2 |
Max. Traction | kN | 100 | 100 | 80 |
Gradeability | o | 25° | 25° | 25° |
Track frame swing angle | o | -7~+12 | -7~+12 | -10~+10 |
Ground clearance of chassis | mm | 400 | 400 | 400 |
Dimensions | ||||
Weight | kg | 15000 | 15000 | 12000 |
Length*width*height (working) | m | 92x2.6x8.6 | 92x2.6x8.6 | 6.68x2.42x7.98 |
Length*width*height (Transport) | m | 11.2x2.6x3.5 | 11.2x2.6x3.5 | 8x2.42x3.4 |
Recommended aperture range: 80-115mm
GIA B1 integrated open-air down-the-hole drilling rig integrates down-the-hole drilling rigs and mobile air compressors, compact structure, flexible and mobile.
Convenient position and transition. The drilling rig is equipped with two-stage dry dust removal, which has an excellent effect on resisting dust emission; the equipment is mainly used for ore,
Limestone mining, road construction and other open-pit projects.
GIA B1C is based on B1. The drill tower is upgraded from steel to aluminum alloy, and the guide rail is equipped with an automatic rod changing system to achieve single
Human operation greatly reduces labor intensity, makes holes straighter, and improves comprehensive perforation rate by about 15%.
Drill Tower
The use of oil cylinders and steel wire rope chains can advance the mechanism more smoothly and powerfully.Drill arm and bracket adopt high-strength connectors, which are firm and reliable.
Power System
Equipped with Yuchai diesel engine to meet the national I Sichuan emission standard, equipped with high wind pressure and large displacement air compressor, high energy efficiency ratio
Walking System
It adopts two-speed disengageable hydraulic walking mechanism, in case of emergency, the brake can be disengaged and the whole machine can be moved. Equipped with automatic leveling device, stable walking, can traverse various complex terrain
Rotary System
High-torque power slewing head, providing stable and long-lasting slewing power, adapting to various rock working conditions
Control Operation
The direct control hydraulic system design is simple and practical, with low failure rate. The instrument display is highly integrated and monitors various parameters in real time. There are multiple fault alarms, which are intuitive and concise.
Hydraulic Dust Collector
Standard two-stage dry dust collector, high-power vacuum cleaner, 14m2 filter area, removable dust hood.