Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year or 2000hours |
Suppliers with verified business licenses
Oil Drilling Mud System is the a multi-tank mud system, it is also called solids control system, or mud circulation system for the oil gas drilling rigs. GN oil drilling mud system is available for different oil drilling rig sizes from 250HP to 3000 HP with different capacity.
Oil drilling mud system including following solids control equipment:
1) Shale Shaker for primary solids control 100 microns.
2) Desander for second phase solids control of cuttings 40 microns.
3) Desilter for third phase solids control of cuttings 20 microns.
4) Decanter Centrifuge for the 2-7 microns fine solids separation.
Oil drilling Mud System normally including following mud tanks depends on the function of the mud tanks.:
1) Silting mud tank ( Shaker Tanks)
2) Active Mud Tank
3) Suction Mud Tank
4) Mixing Mud Tank
5) Storage Mud Tank