Tunnel arch trolley is a tunnel support installation equipment, which can be widely used in railway, highway, metallurgy, underground engineering and water diversion engineering and other fields of tunnel, shaft, culvert and other construction support and aerial work. 1. Intelligent and efficient vertical arch, performance increased by 50%; One-key operation of vertical arch positioning to achieve fast and accurate assembly of arch frame; Manipulator control, arch frame connection flange hole precise alignment, arch frame connection firm and reliable; The posture adjustment of the whole arch frame can meet the design position requirements; The construction of steel arch frame saves 50% of the time compared with the traditional construction method; 2. Remote monitoring, precise positioning; By adopting the integrated positioning and scanning device, the accurate positioning of the trolley in the tunnel is realized; Remote monitoring can be carried out through the network, and the motion trajectory animation of the trolley can be generated in any period of time, and the value of each instrument of the trolley can be viewed in real time; 3. 3D contour scanning to optimize construction; When the scanner is working, the coordinates of any point in the tunnel can be measured to form a "point cloud", and the automatic processing software of three-dimensional contour reconstruction can calculate and obtain data such as tunnel over-under-excavation, realize the comparison of the scanning contour and the design contour, and guide the arch installation; Automatically record and store 3D scan logs for analyzing over- and under-digging conditions and optimizing arch operations. 4. High-altitude construction, multi-construction method applicability, multi-functional operation; Suitable for construction operations in high altitude and low temperature environment; It is suitable for full-section (including elevation arch), large section, micro-step method and other construction methods; It is suitable for steel arch installation, anchor installation, anchor net installation, explosive filling, auxiliary prying, auxiliary measurement, ventilation pipe operation, etc.
items | Unit | parameter | |||
SCD133 | |||||
Three arms (three hanging baskets) | |||||
Total weight | kg | 42200 | |||
Machine size: length× width × height | mm | 14500×2700×3400 | |||
Total electrical power | kW | 55 | |||
Engine power rating | kW | 118 | |||
Maximum working cross-section: | m | 16×13 | |||
Width × height | |||||
Minimum working cross-section: | m | 6×6 | |||
Width × height | |||||
Boom load capacity | kg | Arch boom | 2×1000 | Main boom | 1500 |
platform boom | 2×500 | jib | 2×700 | ||
Number of rock drills | PCS | / | |||
Maximum impact power | kW | ||||
Maximum drilling depth | m | ||||
Starting water pressure | bar | ||||
Arch arm slip stroke | m | 3.2 | |||
Maximum climbing capacity | % | 25 | |||
Cable length | m | 80 | |||
Minimum turning radius (inside/outside) | m | 6.4/11.25 | |||
Maximum travel speed | km/h | 15 | |||
Steering mode | / | front steering |