Customization: | Available |
---|---|
After-sales Service: | 1 Year Aftersale Service on Site |
Warranty: | 1 Year |
Suppliers with verified business licenses
Product Introduction
1. LW186FV is a three-stage product independently developed, equipped with electronically controlled high-voltage common rail Guo3 4102 engine, high-quality split double change, four-wheel drive, full hydraulic steering, strong power, higher efficiency and stronger environmental adaptability.
2. A variety of working devices and auxiliary tools can be selected to realize one machine with multiple functions, which are widely used in loading, traction, lifting, transportation and other operations in infrastructure, sanitation, farmland, road renovation, ports, freight yards and other places.
3. The hydraulic oil replacement cycle is extended to 2000 hours, which greatly reduces the cost of user use.
Performance features
1. It adopts long wheelbase (2350mm) design, which adapts to a variety of overweight working conditions and has better stability in the industry.
2. Strong shoveling (digging force≥ 44KN), strong breaking force, and light lifting of a variety of materials.
3. Fast and efficient, driving speed up to 24km/h, the industry is better.
4. More than 3 meters of unloading height to meet the needs of various occasions.
Model features
1. Yunnei 4102 supercharged three-stage engine has more powerful power, higher efficiency, and electronically controlled high-voltage common rail technology to truly achieve fuel saving and consumption reduction.
2. Reinforced heavy-duty drive axle to meet the needs of high-intensity and high-load operation.
3. Xulun "A" brand tires, wear-resistant and reliable, adapt to a variety of harsh working conditions, efficient operation.
4. CAE simulation, working device to meet heavy load conditions; Proprietary bucket type, more labor-saving for inserting the pile; Use wear-resistant materials to improve working life.
5. Pipeline lines are concentrated and reasonable; Double sealing, leak-proof and more reliable.
6. Streamlined appearance, overall front hood, wide vision, comfortable operation in large space, convenient maintenance.
7. Optional 3-meter, 4-meter unloading working device, as well as a variety of tools to meet different working conditions.
Main Parameters
|
Parameters
|
Unit
|
|
Rated operating load
|
1400
|
kg
|
|
Dumping height
|
3000
|
mm
|
|
Dumping distance
|
950
|
mm
|
|
Bucket capacity
|
1
|
m3
|
|
Machine weight
|
5000
|
kg
|
|
Wheel base
|
2300
|
mm
|
|
Tread
|
1500
|
mm
|
|
Hinge-axis height at lifting limit
|
3600
|
mm
|
|
Max. breakout force
|
44
|
kN
|
|
Boom lifting time
|
5
|
s
|
|
Total cycle time
|
9.5
|
s
|
|
Min. turning radius over tyres
|
4450
|
mm
|
|
Articulation angle
|
35
|
|
|
Gradeability
|
25
|
|
|
Tyre size
|
16/70-16
|
-
|
|
Overall machine dimension L*W*H
|
5810*2060*2815
|
mm
|
|
Engine model No.
|
YN4C075-30CR
|
-
|
|
Rated Power/Speed
|
55/2400
|
kW/rpm
|
|
Travel Speed
|
1-gear(F/R)
|
8
|
km/h
|
2-gear(F/R)
|
20
|
km/h
|